
4.2 Single-Host Installation of an SF3xx Storage Array
Figure 4–2 Seating the SF7x OCP
Write
Protect
Ready Fault
DSSI
ID
Write
Protect
Ready Fault
DSSI
ID
d
i g i
t
a l
SHR_X1127A_89
PUSH
PUSH
2. Make sure that the DSSI ID numbers of each magazine tape subsystem
installed in the array are set to 0 and that the Tape Mass Storage Control
Protocol (TMSCP) switch is enabled (down). Refer to the magazine tape
subsystem documentation for the procedure to access the DSSI controller
module.
3. At the rear of the SF3xx storage array:
a. Verify that the correct variation of the power controller exists to meet
the power supplied to the installation site.
b. Make sure that all ac power cords going to the power controller from
devices installed in the storage array are correctly seated in the power
controller.
c. Make sure that the ac breaker is off.
d. Make sure that the bus switch of the power controller is in the on
(down) position. Make sure that the BUS/OFF/ON switch is in the
down position.
CAUTION
Make sure that all ac power switches on each storage element enclosure
and magazine tape subsystem are in the off position.
4. For each SF7x storage enclosure and magazine tape subsystem installed,
check that the ac power cord is correctly seated. See Figure 4–3 and 4–4.
5. Make sure that each SF7x storage enclosure and magazine tape subsystem
has the correct voltage selected for the power. Note that each has a voltage
label for its factory setting.
Installing an SF3xx Storage Array to a VAX 6000 System 4–5
Comentarios a estos manuales