4–11 Removing Terminators and Connecting DSSI Cables at the
System I/O Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4–19
4–12 Placing a Label on a DSSI Cable . . . . . . . . . . . . . . . . . . . . . . 4–21
4–13 Placing a Label on the OCP Door . . . . . . . . . . . . . . . . . . . . . . 4–21
4–14 Placing a Label on the Magazine Tape Subsystem . . . . . . . . . 4–22
5–1 System Configuration Sheet (Single-Host) . . . . . . . . . . . . . . . 5–7
5–2 System Configuration Sheet (Dual-Host) . . . . . . . . . . . . . . . . 5–8
5–3 System Configuration Sheet (Three-Host) . . . . . . . . . . . . . . . 5–9
5–4 Adjusting the OCP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–12
5–5 DSSI ID Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–14
5–6 Installing the OCP on the SF7x Enclosure . . . . . . . . . . . . . . . 5–15
5–7 Drive DC Power Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–16
5–8 AC Power Switch, Voltage Selections, and Power Cord . . . . . 5–17
5–9 Single-Host Bus Configurations . . . . . . . . . . . . . . . . . . . . . . . 5–18
5–10 Dual-Host Bus Configurations . . . . . . . . . . . . . . . . . . . . . . . . 5–19
5–11 Installing the 70- and 108-Inch DSSI Cables for SF2 . . . . . . 5–23
5–12 Installing the 42-Inch DSSI Cable . . . . . . . . . . . . . . . . . . . . 5–25
5–13 Installing 70- and 108-Inch DSSI Cables for SF4 or SF5 . . . . 5–27
5–14 Installing the 42-Inch DSSI Cable (Position 1) . . . . . . . . . . . 5–32
5–15 Installing the 70- and 108-Inch DSSI Cables for Position
2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–34
5–16 Installing the 70-Inch DSSI Cables (Position 3) . . . . . . . . . . . 5–36
5–17 Installing the 70- and 108-Inch DSSI Cables for Position
5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–40
5–18 Placing a Label on a DSSI Cable . . . . . . . . . . . . . . . . . . . . . . 5–45
5–19 Placing a Label on the OCP Door . . . . . . . . . . . . . . . . . . . . . . 5–45
6–1 System Configuration Sheet (Single-Host) . . . . . . . . . . . . . . . 6–5
6–2 System Configuration Sheet (Dual-Host) . . . . . . . . . . . . . . . . 6–6
6–3 System Configuration Sheet (Three-Host) . . . . . . . . . . . . . . . 6–7
6–4 Chassis Retainers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–10
6–5 Securing the Tube to the Weldment Brackets . . . . . . . . . . . . 6–11
6–6 AC Power Switch, Voltage Selections, and Power Cord . . . . . 6–13
6–7 Installing the 42- and 70-Inch DSSI Cable (TF1) . . . . . . . . . . 6–15
6–8 Installing the DSSI Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–17
6–9 Placing a Label on a DSSI Cable . . . . . . . . . . . . . . . . . . . . . . 6–25
6–10 Placing a Label on the Magazine Tape Subsystem . . . . . . . . . 6–26
7–1 Installing Disk Drive/Cabinet Hardware, Front View . . . . . . 7–6
x
Comentarios a estos manuales