3.1 Add-On Disk or Tape Drive Order Sequence
General rules:
1. DSSI has first priority. That means, you mount DSSI in accordance with
the storage array cabling diagrams (see Appendix A). Mount additional
SDI storage elements in the free slots remaining.
• Start mounting tape elements top right position.
• Continue to mount tape storage elements from top to bottom.
• Start mounting disk storage elements in the right bottom position.
• Continue mounting disk storage elements from bottom to top.
2. Second priority, if there are no DSSI storage elements:
• Start mounting RA9x disk drive in positions 1-2 and 5-6 first. For this
position, use the chassis stabilizer brackets.
• Mount SA7x storage elements in the remaining slots.
3–2 Preparation and Installation
Comentarios a estos manuales