
5
Installing the SF7x Storage Enclosure in
an Sx300 Storage Array
This chapter describes the steps to install the SF7x storage enclosure in an
existing Sx300 storage array:
• Steps to install (Section 5.1)
• Cabling the SF7x (Section 5.2)
Single-host configuration (Section 5.2.1)
Dual-host configuration (Section 5.2.2)
• Powering up the SF7x (Section 5.3)
• Labeling the DSSI cables and operator control panel (OCP) (Section 5.4)
• Final verification (Section 5.5)
If you are attempting to install an SF7x in a cabinet other than an Sx300
storage array cabinet, refer to the host system documentation.
Only Digital Multivendor Customer Services and other installing personnel
that have been trained in ESD procedures should use the procedures in this
chapter.
Follow all the steps in this chapter to install an SF7x storage enclosure in an
Sx300 storage array. The steps apply for SF1 to SF6 in the storage array.
Table 5–1 lists the tools required to install the SF7x enclosure into the storage
array.
Installing the SF7x Storage Enclosure in an Sx300 Storage Array 5–1
Comentarios a estos manuales