Manx SA7x Guía de instalación Pagina 150

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 320
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 149
5.4 Labeling the DSSI Cables and OCP
Label Colors Connections
Blue Port 1, SF1, SF3, TF1
Red Port 2, SF2, SF3, TF2
Yellow Port 3, SF4, SF6, TF3
green Port 4,SF5, SF6, TF4
For a dual-host configuration, use the following colored labels on the SF7x OCP
door, magazine tape subsystem front panel, and all DSSI cables:
Label Colors Connections
Blue Port 1, SF1, TF1, port 7
Red Port 2, SF2, TF2, port 8
Yellow Port 3, SF3, TF3, port 9
Green Port 4, SF4, TF4, port 10
Blue with white strip Port 5, SF5, port 11
Red with white strip Port 6, SF6, port 12
5.4.1 Filling Out the Labels
Follow the steps on the inside of the SF Family Label Booklet (part number
36-32882-01) to fill out the labels for the DSSI cables and SF7x operator control
panels.
Proceed once you have filled the cable and OCP labels.
5.4.2 Labeling the Cables
For each cable you just installed, place a label 2 inches behind the connector as
shown in Figure 5–18.
5.4.3 Labeling the OCP
For each OCP on each SF7x you installed, place a label as shown in
Figure 5–19.
5–44 Installing the SF7x Storage Enclosure in an Sx300 Storage Array
Vista de pagina 149
1 2 ... 145 146 147 148 149 150 151 152 153 154 155 ... 319 320

Comentarios a estos manuales

Sin comentarios