
3.15 Right Position Guide Rail Plate Installation
c. While supporting the guide rail plate against the cabinet rear vertical
upright, extend the mounting bracket to engage the two front round
stand-offs into hole numbers 6 and 19 on the cabinet front vertical
upright.
d. From the front, insert and tighten the three shoulder screws and
lockwashers in mounting holdes 5, 12, and 18.
e. From the rear, insert and tighten the three shoulder screws and
lockwashers in mounting holes 5, 12 and 18.
f. Tighten the four flathead mounting bracket screws as shown in
Figure 3–4.
3.16 Chassis Rail Installation (Universal Rails)
Note
Two types of guide rails are available: universal and Radio Electronics
and Television Manufacturer’s Association (RETMA).
To allow the length of the chassis rail to be adjusted to fit the cabinet, one
end of the rail is extendable using a sliding rail bracket. One round standoff
on each end of the guide rail plate is used to locate the chassis rail along the
vertical cabinet rails. The round standoffs are inserted into front and rear
chassis rail locating holes to position the chassis rail while it is fastened to the
cabinet.
Note
Standoff location holes, front and rear, both sides, are holes 17, 35,
and 53 as shown in Figure 3–6. Two small ESD grounding posts are
provided with the cabinet. One is located on a front vertical cabinet
rail, and one on a rear rail. Should an ESD grounding post interfere
with the installation of the chassis rail, move the post out of the way to
any free hole on the cabinet.
3–20 Preparation and Installation
Comentarios a estos manuales