
5.1 Steps to Install
Figure 5–4 Adjusting the OCP
TRANSITION
BOARD
(BEHIND FRAME)
SLOTTED
HOLE
SLOTTED
HOLE
HOLE FOR
RIGHT
POSITION
HOLE FOR
LEFT
POSITION
TRANSITION
BOARD
SCREWS
SHR-X0124-90
3. Check the DSSI ID switches on the OCP.
Open the door on the front of the OCP. Make sure that the DSSI ID
switches (the three rightmost switches) are set according to Figure 5–5.
If they are not, then use a pointed instrument to set the switches to their
correct configuration. See Table 5–3.
Note
The leftmost switch (Mass Storage Control Protocol (MSCP)) should in
the down or enabled position at all times, unless you are instructed to
change it to the up or disabled position.
5–12 Installing the SF7x Storage Enclosure in an Sx300 Storage Array
Comentarios a estos manuales