6.2 Cabling the Subsystem in Sx300 Storage Array Position
1. Swing open the I/O panel from the cabinet frame.
2. Install a 70-inch DSSI cable (part number BC21R–5L) to port 4 on the
Sx300 storage array I/O panel.
3. Connect the other end of this 70-inch DSSI cable to the top DSSI connector
on the rear of the magazine tape subsystem.
4. Install a 70-inch DSSI cable (part number BC21R–5L) to port 10 on the
Sx300 storage array I/O panel.
5. Connect the other end of this 70-inch DSSI cable to the bottom DSSI
connector on the rear of the magazine tape subsystem.
6.3 Powering Up the Magazine Tape Subsystem
Follow these steps to apply power to a newly installed magazine tape
subsystem.
1. Turn the ac power switch on the rear of the subsystem to the on or 1
position.
a. All its OCP indicators turn on (generally within 15 seconds).
b. While the elevator scans the magazine, all OCP indicators, except for
Power On, turn off.
c. Assuming the subsystem has a magazine with a cartridge in position
0, and no cartridge is in the drive, the final power-on self-test (POST)
status displays:
Power On indicator on
Eject indicator on
Load/Unload indicator on
Slot Select indicator on
Slot 0 indicator on
2. If a fault occurs, see Chapter 8 or the Magazine Tape Subsystem service
manual.
Proceed to Section 6.3.1 once these steps are accomplished and the subsystem
has passed POST.
Installing the Magazine Tape Subsystem in an Sx300 Storage Array 6–23
Comentarios a estos manuales