2.1 Unpacking and Placing the Storage Array
Figure 2–1 Shipping Bolts
LEVELER
SHIPPING
BOLT
SHIPPING
BRACKET
SHR_X1102A_89_SCN
2.1.3 Placing the Storage Array
Move the array to its final position—a distance not to exceed 0.9 meters (3 feet)
from any host system cabinet (for DSSI).
2.1.4 Leveling the Storage Array
Once the array is in its final position:
1. Loosen the locknuts on all four leveler feet (see Figure 2–4).
2. Turn each leveler hex nut clockwise until the leveler foot contacts the floor.
3. Adjust all four feet until the cabinet is level and the load is removed from
all casters. Verify that the casters spin freely.
4. Tighten the locknuts on all four leveler feet (see Figure 2–4).
2–4 Unpacking and Repacking a DECArray300 Storage Array