3.2 Add-On Disk or Tape Drive Positions
Example 1: Two RA90, one SA72, and two SF72 should be mounted.
First priority is DSSI. Therefore, mount the two SF72 to positions 1 and 2.
Second priority is the RA90. Therefore, mount the RA90 to positions 5 and
6. Use the chassis stabilizer brackets.
Mount the SA72 to position 4.
Example 2: Two SF72, one TF857, two RA92, and one SA70 should be mounted
in the cabinet.
First priority is DSSI. Therefore, mount the SF72 to positions 1 and 2.
Mount the TF857 tape loader magazine to position 6.
Second priority is to mount the RA9x to the top or bottom slots. Therefore,
mount the first RA92 to position 5. Use the Stabilizer brackets.
Fill the rest of the open slots with the SDI storage elements. For example,
you might mount the SA70 to position 4 and the second RA92 to position 3.
Example 3: There are two SA72’s mounted to the storage cabinet to positions 1
and 2. The customer would like to add one SF72 storage element.
First priority is DSSI. Therefore, the SF72 Storage Element should be
mounted to position 1. Remount the SA72 from position 1 and mount the
SF72 to position 1. Another possibility is to mount the first SF storage
element in position 4. Nevertheless, cable the first DSSI storage element
as SF1 and label it accordingly.
Mount the second SA72 to position 4 in case you mounted the first SF
storage element into Position 1.
1. Upper level disk or tape drive installation
When installing an add-on RA9x storage element to positions 6 or 5 of the
cabinet, it is necessary to remove the cabinet top cover. The drive chassis
stabilizer bracket cannot be removed from the frame and attached to the
upper level disk drive without first removing the cabinet top cover. See
Section 3.7.
Each upper level disk or tape drive is supported by two chassis retainer
brackets (top and bottom). Only for the RA90/RA92 you need one chassis
stabilizer bracket, and two (top and bottom) rear lock-down brackets
with one U-clip each. Detailed instructions for removing/installing this
hardware are found in Section 3.12 and in Section 3.17.
Preparation and Installation 3–5
Vista de pagina 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 319 320

Comentarios a estos manuales

Sin comentarios